PAVE PROJECT MANAGER

The back office solution to detect thermal segregation

Pave Project Manager serves to create evaluations and quality analysis for paving in road construction. The data is read from the project files recorded at the respective road construction sites with the Pave-IR system.

A project file contains the thermal profile, the time, the construction track and the GNSS positions of a paved road section.

The thermal profile shows you many characteristics of the paving process. You can not only interpret the homogenity of the apshalt mat, it also shows you the material flow, the paver stops and even the truck loads.




WHAT IS THERMAL SEGREGATION?


Thermal segregations are temperature differences in the hot mix asphalt mat.
It can cause premature failure in asphalt roads
and reduces the pavement's lifespan due to low density from cold spots.


The MOBA PAVE-IR visualizes the thermal segregation
in the asphalt mat to prevent those premature failures.




How it looks on the paver

Real-time process data of the jobsite


How it looks in the back office

Real-time project analysis


Overview of the modules

  • Individual temperatures
  • Time diagram, e.g. for paver stops
  • Quality factor diagram
  • Speed diagram
  • Weather diagram
  • Map view
  • Report generation
  • Selection of areas to ignore
  • Future functions can be added




Generate your own reports

Reports specific to various DOT specifications can be generated in the Pave Project Manager. This report is based on TxDOT thermal specification Tex-244-F. The Report includes thermal and position details for each thermal profile.

The self-explanatory temperature profiles help you to easily analyse your jobsite project and optimize for future projects. With the reports you can also prove the quality of the job to your client.


CONTACT